Next came the plumbing. Two men came to install the PVC piping, the pump, the heater, etc. They put the pipes inside the steel frame and tested the system with air pressure before leaving. Again, everything happened in a day and things were moving along just fine. Then came April... a very wet April. The next step in construction would have to wait until the rain stopped. And with each rain there came erosion and dirt was washed into the steel. We were told it would be mucked out as soon as the weather permitted.